Now that the equipment has been received (T165542), it needs to be racked.
I have a draft of current/transition/final rack elevation on:
https://docs.google.com/spreadsheets/d/1MOnChfjRT0mFQAEzFwWx-PAiS3KvHdswnzeVOHbN8eE/edit#gid=1155493243
(see the notes as well)
@Cmjohnson , could you let me know if that plan is possible and makes sens to you? (as the reality can be quite different from the racktables view). Especially in eqiad where the rack is quite full and leaves us with little margins.