Page MenuHomePhabricator

set up cr3-esams
Closed, ResolvedPublic

Description

Set up our new MX480 @ esams. This includes:

  • Racking and powering up
  • Initial configuration (mgmt/console/etc)
  • JunOS upgrade (either 16.x or 15.1 with Junos Continuity Package)

Went with 15.1F5.15 + Junos Continuity Package, as 15.1 is JTAC recommended, we don't have any device running 16.x and going through the changelog no feature from 16 seems to stand out

  • Finalize configuration: interfaces, protocols, etc.. from cr1-esams

Cables/optics: requested in T215990
In a maintenance window:

  • Prepare Puppet/DNS changes
  • Ensure cr3 config is similar to cr1
  • Ensure cr3 is running up to date code version
  • Depool esams
  • Verify vrrp master is on cr2
  • Power down cr1
  • Move cr1 transit/transports to cr3
  • Connect and configure asw-oe14<->cr3
  • Connect and configure asw-oe16<->cr3
  • Update Netbox/DNS/Monitoring
  • Verify monitoring is all green, BGP/LACP/OSPF/BFD sessions are UP
  • Repool esams

  • Power-off, factory reset, unrack cr1-esams
  • cleanup conserver config, update inventory
  • Update interfaces descriptions, interface PTRs etc

Event Timeline

ayounsi mentioned this in Unknown Object (Task).Feb 13 2019, 2:29 AM