This task will track the racking, setup, installation, and implementation of the 4 new 10G switches order in T195454.
@ayounsi please confirm with the name proposal below
asw2-a4-codfw
asw2-b4-codfw
asw2-c4-codfw
asw2-d4-codfw
asw2-a4-codfw is already racked. I have a temporally console cable running from scs-a1-codfw on port 48 to it. Once you are done with the configuration, I can move the temporally console cable to the next switch (asw2-b4-codfw)
Row A
Shopping list:
18* SFP-T
4* 5m 40G DAC
1* 3m 40G DAC
- Order cables/SFPs [arzhel]
- Rack QFX [papaul]
- Connect console [papaul]
- Connect USB drive containing Junos 14.1X53-D43.7 (present in install2002:/home/ayounsi/jinstall-qfx-5-14.1X53-D43.7-domestic-signed.tgz) [papaul]
- Pre-populate SFP-Ts [papaul]
ge-4/0/0 ge-4/0/1 ge-4/0/2 ge-4/0/3 ge-4/0/4 ge-4/0/5 ge-4/0/6 ge-4/0/7 ge-4/0/8 ge-4/0/9 ge-4/0/10 ge-4/0/11 ge-4/0/12 ge-4/0/13 ge-4/0/14 ge-4/0/15 ge-4/0/16 ge-4/0/17
- Upgrade and configure VCP on QFX [arzhel]
- Connect VCP a3-a5; a6-a8; a2-a4*; a4*-a5; a4*-a6 (a4* = new QFX) [papaul]
In window:
- Shutdown EX [arzhel]
- Move server's uplinks from EX to QFX [papaul]
- Reconfigure VCP with QFX serial# [arzhel]
- Move VCP a3-a4 to a3-a4* and a4-a7 to a4*-a7 [papaul]
- Disable a2-a5 VCP [arzhel]
- Remove a2-a5 link [papaul]