Page MenuHomePhabricator

decommission frav1001.frack.eqiad.wmnet
Closed, ResolvedPublic

Description

frav1001 has been replaced by frav1002. It is powered off and ready for decommissioning

  • all system services confirmed offline from production use
  • set all icinga checks to maint mode/disabled while reclaim/decommmission takes place.

START NON-INTERRUPPTABLE STEPS

  • disable puppet on host
  • power down host
  • disable switch port
  • switch port assignment noted on this task (for later removal)
  • remove production dns entries

END NON-INTERRUPPTABLE STEPS

  • system disks wiped (by onsite)
  • system unracked and decommissioned (by onsite), update racktables with result
  • switch port configration removed from switch once system is unracked.
  • add system to decommission tracking google sheet
  • mgmt dns entries removed.

Related Objects

StatusSubtypeAssignedTask
ResolvedJclark-ctr

Event Timeline

Dzahn triaged this task as Medium priority.Apr 30 2019, 6:32 PM
Dzahn moved this task from Backlog to Decommission on the ops-eqiad board.
ayounsi closed subtask Restricted Task as Resolved.Sep 19 2019, 8:17 PM

Change 544279 had a related patch set uploaded (by Papaul; owner: Papaul):
[operations/dns@master] DNS: Remove production and mgmt DNS for frav1001

https://gerrit.wikimedia.org/r/544279

papaul@fasw-c-eqiad# show | compare 
[edit interfaces interface-range vlan-administration]
-    member "ge-[0-1]/0/3";
[edit interfaces interface-range disabled]
     member ge-1/0/6 { ... }
+    member ge-0/0/3;
+    member ge-1/0/3;
[edit interfaces]
-   ge-0/0/3 {
-       description frav1001;
-   }
-   ge-1/0/3 {
-       description frav1001:eth1;
-   }

Change 544279 merged by Jgreen:
[operations/dns@master] DNS: Remove production and mgmt DNS for frav1001

https://gerrit.wikimedia.org/r/544279

RobH removed a subscriber: Papaul.