Page MenuHomePhabricator

rack/setup/install replacement payments2001.frack.codfw.wmnet
Closed, ResolvedPublic

Description

  • - receive in system on procurement task T237442
  • - rack system in frack
  • - bios/drac/serial setup/testing
  • - mgmt dns entries added for hostname (drop in replacement, use existing mgmt dns)
  • - network port setup (description, enable, vlan) - attach two network ports, one to each asw, ports assigned to frack-eqiad-fundraising vlan.
    • end on-site specific steps - handoff to Fundraising for remainder as they use their own puppet master.
  • - production dns entries added - (drop in replacement, use existing prod dns)
  • - OS installation
  • - interface bond0 configured
  • - host state in netbox set to staged
  • - clone database and configure replication
  • - configure icinga monitoring
  • - service deployment
  • - service implementer changes from 'staged' status to 'active' status in netbox'

DRAC Setup Info

The drac network and login settings are different on frack than production.
Please setup the network with the following details:

Hostname (temporary): payments2001-a
IP: 10.195.0.108
Netmask:
Gateway:

The root password for drac is different. Please check the password store, and if you still cannot access it, use the production idrac password and ping @RobH (or @Jgreen) to login and change it to the frack idrac password.

Event Timeline

Jgreen added a subtask: Unknown Object (Task).
Jgreen claimed this task.
Jgreen triaged this task as Medium priority.
Jgreen updated the task description. (Show Details)
Jgreen updated the task description. (Show Details)
Jgreen moved this task from Up Next to Done on the fundraising-tech-ops board.