17 May - 24 May
- Set up Toolforge.
- Migrate tooling back to 3.7.3
- Wrapper-up ircbot code
- Set up Kubernetes pods.
- Build code locally and ensure everything works.
- Format Zulip replies
- F-stringify
- Separate production and testing freenode accounts
25 May - 31 May
- Clean up everything and push to Toolforge.
- Ensure everything keeps working in production.