I have backup2003 that was order in T271231 and i am planning the racking of this server. For that I will like to relocate logstash2035 from U3 in Rack C3 to U5 so i can use U3 and U4 for backup2003.
What needs to be done?
Just depool the server and power it down.
How long will it take?
5 minutes
Any changes ?
No
When?
If possible tomorrow 10am Dallas time