Page MenuHomePhabricator

[Metrics Platform] Evaluate preliminary list of standard fields for feasibility
Closed, DuplicatePublic

Description

To make a final decision on the standard base schema for v1, we need to dig into the preliminary list of fields in the code to check for feasibility, triage, and prioritize.

Working list: https://docs.google.com/document/d/1Z_KRHWw7hNXldePxJP1YTvxJHOtKzZ3kSTo7YPkdp4k
Feasabilty assessment for items in the working list: https://docs.google.com/spreadsheets/d/1fmAtvRsXltMOzBJ8Br9QxCdBaPHDT0ygrXXZ1CGASq8

Event Timeline

Mholloway updated the task description. (Show Details)
Mholloway moved this task from To Do to Doing on the Better Use Of Data board.
Mholloway moved this task from Inbox to Doing on the Product-Data-Infrastructure board.

I think this is done, considering the task is scoped to the preliminary list? The preliminary list is essentially the green portion of the spreadsheet.

But, there is a subtask to be created shortly about device detection strategies. That probably precludes closing this one for now.