Description

The Raritan PDU was very easy to configuration and integrate to our monitoring system compare to the Chatsworth PDU, however the PDU doesn't have the plugs on a single row like the other PDU's making not great when it comes to managing the server power cords. According to the vendor it is not an option to provide us with the same PDU but having the plugs on a single row; so we have decided to not go for the Raritan PDU

Event Timeline

Papaul triaged this task as Medium priority.Jul 30 2021, 2:44 PM
Papaul lowered the priority of this task from Medium to Low.Jul 30 2021, 2:49 PM

I open ticket #2045424 with CY1 to unplug both test PDU's in D8 for tomorrow. We will be putting back the old PDU for now until we received another test PDU.

Change 711717 had a related patch set uploaded (by RhinosF1; author: RhinosF1):

[operations/puppet@production] remove test PDUs that are being shipped back

https://gerrit.wikimedia.org/r/711717

Both test PDU's removed and old PDU"s back in place.

Change 712917 had a related patch set uploaded (by Filippo Giunchedi; author: Filippo Giunchedi):

[operations/puppet@production] facilities: remove test PDUs

https://gerrit.wikimedia.org/r/712917

Change 712917 abandoned by Filippo Giunchedi:

[operations/puppet@production] facilities: remove test PDUs

Reason:

Obsoleted by If0e4e758798

https://gerrit.wikimedia.org/r/712917

Change 711717 merged by Filippo Giunchedi:

[operations/puppet@production] remove test PDUs that are being shipped back

https://gerrit.wikimedia.org/r/711717

Shipped out the CPI PDU today

This is complete