[placeholder task]
For context, see item 1 in this doc.
- Dependent on testing by analytics team of schema
- Dependent on configuration of stream configuration
Acceptance criteria: TBD
[placeholder task]
For context, see item 1 in this doc.
Acceptance criteria: TBD
Status | Subtype | Assigned | Task | ||
---|---|---|---|---|---|
Resolved | phuedx | T274175 Control instruments with Stream Configuration | |||
Declined | None | T289608 Review names of each attribute & patch as needed |
This work was done as part of a number of other tasks prior to the deployment of the first analytics instrumentation stream to use the Metrics Platform.