This task represents the work with implementing the instrumentation required to evaluate the impact of the three talk page usability improvements we have planned:
Implementation Steps
| Step | Description | Owner | Ticket | Status |
|---|---|---|---|---|
| 1. | Create measurement plan | @ppelberg | T287120 | In progress |
| 2. | Create instrumentation spec | @MNeisler | T302999 | |
| 3. | Determine what – if any – new events/schema are needed | @MNeisler | T302999 | |
| 4. | Propose naming conventions for events that require new instrumentation | @MNeisler | TICKET NEEDED | |
| 5. | Review naming conventions for events that require new instrumentation | @DLynch | TICKET NEEDED | |
| 6. | Document new events/instrumentation that needs to be implemented | @MNeisler | TICKET NEEDED | |
| 7. | Consult with WMF legal team | Legal Team | TICKET NEEDED | |
| 8. | Implement new instrumentation | Editing Engineering | T304910 | |
| 9. | Verify new events are being emitted as expected | Editing QA | TICKET NEEDED | |
| 10. | Verify new events are arriving in DB as expected | @MNeisler | TICKET NEEDED |