This is the master tracking task of the buildout of the eqiad expansion cage:
- - Terms and conditions reached on new contract (T281192)
- - Handoff of the new cage by Equinix
- - Ordering equipment (T287591, T294779, T291485, T290527, T296442)
- - Cabling Diagram (T292095)
- - Installation and configuration of PDUs (T290899, T296424)
- - Installation of vertical cable ducts
- - Setup management network (T296271, T298980)
- - Cabling of Expansion Switches (T292095)
- - Installation of access switches (T292095)
- - Installation of Opengear Serial Console Eqiad New Cage (T299759)
- - Configuration of New Switches (T299758)
- - Monitoring additions for new Switches
- - Installation and cabling of new LVS servers (T295804, T295825, T301419)
- - Configuration of LVS servers
- - Cabling for new WMCS switches (T301419)
- - Configuration of new WMCS switches
- - Ordering additional optics and cables (T338789)