msw2-eqiad is ready and powered off after being prepared in T296271.
This task is to rack it in its final location (at DCops' discretion).
It will then need:
- to keep its em0->ge-0/0/0 loop cable
- to have its et-0/1/0 port connected to msw1-eqiad:et-0/1/0 using one of the X-cage fibers
Once completed and powered up, it should be reachable over the network