cloudsw2-c8-eqiad has been brought up as a stopgap solution as cloudsw1-c8 was becoming full due to servers using two uplinks.
Thanks to T319184: Move WMCS servers to 1 single NIC cloudsw1-c8-eqiad now have 8 free switch ports, 3 more once the last 3 cloudvirt servers will be migrated to 1 NIC then 2 more once T330479: Move WMCS servers out of eqiad row B is done. Enough for the rack's capacity.
The last server on cloudsw2-c8-eqiad is cloudcephosd1021 (using 2 switch ports).
Moving it to cloudsw1-c8 will allow us to decom cloudsw2-c8 and thus cleanup the configuration, help to keep a stable infra, free up (U & cabling) space in the rack.
As it's the same vlan on both switches there is no re-numbering needed, the process is straightforward (and they don't need to move physically):
- Configure the new switch ports
- Move the cables
- Un-configure the old switch ports
- Update the cables in Netbox
They can also be done one at a time if needed.