For the codfw row A-B migration there are some devices connected to the existing virtual-chassis switches that need special consideration to migrate. In general we should tackle these moves once T347191 is completed, and before we start moving the links for the standard servers from old to new top-of-rack.
I've created child tasks to track the progress on each of these.