Once pc3 is fully done, move them to pc2 so pc2 can be reimaged
- pc1014
- pc2014
Once pc3 is fully done, move them to pc2 so pc2 can be reimaged
| Subject | Author | Repo | Branch | Lines +/- | |
|---|---|---|---|---|---|
| pc1014: Move to pc2 | Marostegui | operations/puppet | production | +1 -1 | |
| pc2014: Move it to pc2 | Marostegui | operations/puppet | production | +1 -1 |
| Status | Subtype | Assigned | Task | ||
|---|---|---|---|---|---|
| Resolved | Marostegui | T356960 Upgrade hosts to MariaDB 10.6 | |||
| Resolved | Marostegui | T351620 Upgrade pc2 to Debian Bookworm and MariaDB 10.6 | |||
| Resolved | Marostegui | T351284 Upgrade pc3 to Debian Bookworm and MariaDB 10.6 | |||
| Resolved | Marostegui | T351285 Move pc3 spares to pc2 |
Change 974868 had a related patch set uploaded (by Marostegui; author: Marostegui):
[operations/puppet@production] pc2014: Move it to pc2
Change 974868 merged by Marostegui:
[operations/puppet@production] pc2014: Move it to pc2
Change 975946 had a related patch set uploaded (by Marostegui; author: Marostegui):
[operations/puppet@production] pc1014: Move to pc2
Change 975946 merged by Marostegui:
[operations/puppet@production] pc1014: Move to pc2