Page MenuHomePhabricator

[Q4 FY 24-25 Applied Science] Building the Foundations Research
Closed, ResolvedPublic

Description

This is a parent task to capture the Q4 work by Applied Sciences (Research) related to Building the Foundations. It will capture prioritization decisions and major weekly updates related to tasks in this bucket from April - June 2025. More fine-grained updates and coordination will occur in the subtasks as appropriate. It follows the Q3 tasks (T383612 and T383594).

Confirmed Projects

ProjectResponsiblePrioritizationTicketStatus
AI use-cases write-up@diegoEssential WorkT382727Ongoing
AI Re-training@diegoEssential WorkT392305Complete
Survey strategy brief@YLiou_WMFEssential WorkT391125Ongoing
Survey support desk@TAndicEssential WorkN/AComplete
ICWSM attendance@PabloEssential WorkT393472Complete
WWW attendance@diegoEssential WorkN/AComplete

Details

Due Date
Jun 30 2025, 4:00 AM

Event Timeline

Isaac triaged this task as High priority.
Isaac set Due Date to Jun 30 2025, 4:00 AM.
Isaac moved this task from Backlog to FY2024-25-Research-April-June on the Research board.
Isaac edited projects, added: Research (FY2024-25-Research-April-June); removed: Research.
Isaac added a subscriber: Pablo.

Weekly updated:

  • Survey support desk: Survey feedback for GLAM Wiki and WMDE upcoming surveys
  • AI use-cases write-up: Updating figures and collecting related work.

Weekly update:

  • Survey strategy brief: Drafting is underway under the current scope (will be updated if scope expands).
  • AI use-cases write-up: Normalizing outputs to make results easier to compare across experiments.

Weekly Update:

  • Survey support desk
    • Reviewed Committee Support survey data cleaning
    • Tested SurveyMonkey as a potential tool
  • ICWSM attendance: Workshop submission results should be resolved this week.

Weekly update:

Weekly Update:

  • AI use-cases write-up: Shared draft with @Isaac
  • WWW attendance (follow-up): The invitation to give a (online) talk at CSIRO has materialized. I'll coordinate with @Isaac and @KinneretG to decide how to proceed.
  • Survey support desk:
    • Tooling decision: Qualtrics account management will transition to DesRes team, @TAndic will continue support through August (for sabbatical coverage)
    • WMDE community survey final review and approval complete for Central Notice

Weekly update:

  • AI use-cases write-up: Doing minor changes. Also shared with the full team for review.

Weekly Update:

  • AI retraining: @MunizaA is working in a Airflow DAG. Right now, the DAG provides a graphical interface to create several training datasets.
  • AI use-cases write-up: Discussing with @Isaac who to scope and polish the message for this paper.

Weekly update:

  • Survey support desk : Provided feedback on GLAM organizing survey
  • ICWSM attendance:
  • Survey support desk:
    • Provided feedback for Codex staff survey
    • @DDeSouza updated the LimeSurvey theme to make font size differences less extreme between text elements
  • AI Re-training: @MunizaA had shared a first version of the retraining Airflow DAG, we are working on refining it.

Weekly Update:

  • ICWSM attendance:
    • The slides for the presentation are ready after incorporating feedback.
    • Chairing two sessions ( details at T393472#10912463)
  • Survey support desk: Shared decision-making document for survey support to Leila.
  • AI Re-training: Presented the work at the Applied Science meeting, and incorporating feedback from there (updated the task description to reflect the status for the project).

Weekly update:

  • ICWSM attendance:
    • The work on Crowdsourced Content Moderation in Wikipedia: A Preliminary Look at Article Maintenance Templates across Language Editions was presented at the workshop.
    • A report summarizing interactions and insights from ICWSM will be prepared next week.
  • AI Re-training
    • @MunizaA deployed DAG to the Research Airflow Instance
    • We have been debugging the DAG. There is still some small bugs that need to be resolved. In case Muniza lost her access to the servers before finalizing this process, I'm going to talk to @fkaelin
  • AI use-cases write-up: Received feedback from @Isaac that I'm planning to process next week.
Isaac updated the task description. (Show Details)