High level placeholder task for the purchase/installation/configuration of new switches in eqiad rows C and D, as well as the migration of hosts to the new top-of-racks and decommissioning of the old hardware.
Description
Details
Event Timeline
Adjusted Mgmt in Rack D1 , D8 down to place spines in top of rack. Updated netbox and installed Rails
@cmooney @ ayounsi
This morning, I updated NetBox with names and locations for all refresh switches and ran two new console cables to SCS. I also verified cable IDs to ports—everything looks correct following the error found yesterday with racks D1 and D2. Assuming no mistakes were made with the cable labels during the original installation.
Switch cableid port
lsw1-c2-eqiad 2819 10
lsw1-c3-eqiad 2820 11
lsw1-c4-eqiad 2821 12
lsw1-c5-eqiad 2822 13
lsw1-c6-eqiad 2823 14
lsw1-c7-eqiad 2824 15
lsw1-d1-eqiad needs to be added to netbox id#1254 26
lsw1-d2-eqiad 3979 30
lsw1-d3-eqiad 3981 31
lsw1-d4-eqiad 3982 32
lsw1-d6-eqiad 3984 34
lsw1-d7-eqiad 3985 35
lsw1-d8-eqiad 3986 36
ssw1-d1-eqiad 3980 29
ssw1-d8-eqiad needs to be added to netboxid #1317 27
Change #1191025 had a related patch set uploaded (by Cathal Mooney; author: Cathal Mooney):
[operations/dns@master] Reverse include file statement for 2620:0:861:fe17::/64
Change #1191025 merged by Cathal Mooney:
[operations/dns@master] Reverse include file statement for 2620:0:861:fe17::/64
Change #1191429 had a related patch set uploaded (by Cathal Mooney; author: Cathal Mooney):
[operations/homer/public@master] ssw1-d8-eqiad: add bgp peerings to CR and Juniper spines
Change #1191429 merged by jenkins-bot:
[operations/homer/public@master] ssw1-d8-eqiad: add bgp peerings to CR and Juniper spines
Change #1198370 had a related patch set uploaded (by Cathal Mooney; author: Cathal Mooney):
[operations/dns@master] Include statements in reverse zones for new subnets
Change #1198370 merged by Cathal Mooney:
[operations/dns@master] Include statements in reverse zones for new subnets