Page MenuHomePhabricator

eqiad A/B switch cabling documentation
Closed, ResolvedPublic

Description

This task will track the documentation of the eqiad rows A/B switch stack cabling for upgrade to ensure no items are missed on order task T418009. Since the order task will have pricing info and be private, we've created this public task for tracking the actual cabling and diagrams for netops

Cabling Diagrams & Cable Matrix

Parts list for Order

< to be determined once the diagrams and matrix are provided by netops >

Related Objects

StatusSubtypeAssignedTask
In ProgressRobH
ResolvedRobH

Event Timeline

RobH added a parent task: Unknown Object (Task).

@ayounsi or @Papaul: Would one of you be best suited to provide the cable diagram and matrix so we know how/where each switch is connecting to the others? I didn't want to just assume an exact duplicate of C/D, since C/D didn't include C1 at the time and assuming anything for a project this large is likely a bad idea.

Once we have a listing of all patches/media types/speed, and where they'll connect, I can compile an fs.com list and quote for purchase.

RobH added a parent task: Unknown Object (Task).Feb 20 2026, 6:40 PM

@RobH please see below for the diagram requested. Note: On site need to provide the fiber length needed for each connection. I have included on the diagram the type and number of fiber needed and also the type and number of transceiver. Let me know if you have any question. All the links are 100G.

B refresh.jpg (1,049×729 px, 171 KB)

Thanks @Papaul

We went with CWDM for the spine/leaf in rows C/D (T404103 and T396065#11047207), so it's best to do the same with A/B.

We would also need 238 SFP-T as of right now (119 in each row). Could you check with onsite how many spares we have in eqiad/codfw so we know how many new we have to purchase.

ayounsi triaged this task as Medium priority.Feb 23 2026, 3:29 PM

@RobH like @ayounsi mentioned today everything for row A/B should be QSFP-100G CWMD4 like in row C/D so no need for the QSFP-100GBASE-SR4 and the MTP OM4 mutimode fiber like I have it on the diagram. The new count will be:
84+1x QSFP-100G-CWDM4 1310nm
46x OS2 Single-Mode Fiber (LC-LC SMF)
Please let me know if you have any questions. Thanks.

RobH mentioned this in Unknown Object (Task).Mar 4 2026, 7:13 PM

@RobH like @ayounsi mentioned today everything for row A/B should be QSFP-100G CWMD4 like in row C/D so no need for the QSFP-100GBASE-SR4 and the MTP OM4 mutimode fiber like I have it on the diagram. The new count will be:
84+1x QSFP-100G-CWDM4 1310nm
46x OS2 Single-Mode Fiber (LC-LC SMF)
Please let me know if you have any questions. Thanks.

To be clear, the "> 46x OS2 Single-Mode Fiber (LC-LC SMF)" is for every switch to switch connection right? So we'll need assorted lengths according to on-site measurements? Is there a google sheet listing of the fiber connections or can we create one so we can put in the measurements?

@RobH like @ayounsi mentioned today everything for row A/B should be QSFP-100G CWMD4 like in row C/D so no need for the QSFP-100GBASE-SR4 and the MTP OM4 mutimode fiber like I have it on the diagram. The new count will be:
84+1x QSFP-100G-CWDM4 1310nm
46x OS2 Single-Mode Fiber (LC-LC SMF)
Please let me know if you have any questions. Thanks.

To be clear, the "> 46x OS2 Single-Mode Fiber (LC-LC SMF)" is for every switch to switch connection right? So we'll need assorted lengths according to on-site measurements? Is there a google sheet listing of the fiber connections or can we create one so we can put in the measurements?

I've updated parent project trackign task with a google sheet link that includes all links from the diagram so Valerie can update with the patch lengths needed.

Please see below for the spine to spine port information

SwitchInterfaceSwitchInterface
ssw1-a1-eqiadethernet-1/31ssw1-f1-eqiadet-0/0/28
ssw1-a1-eqiadethernet-1/30ssw1-e1-eqiadet-0/0/28
ssw1-a1-eqiadethernet-1/29ssw1-d8-eqiadethenet-1/29
ssw1-a1-eqiadethernet-1/28ssw1-d1-eqiadethenet-1/29
SwitchInterfaceSwitchInterface
ssw1-a8-eqiadethernet-1/31ssw1-f1-eqiadet-0/0/27
ssw1-a8-eqiadethernet-1/30ssw1-e1-eqiadet-0/0/27
ssw1-a8-eqiadethernet-1/29ssw1-d8-eqiadethenet-1/28
ssw1-a8-eqiadethernet-1/28ssw1-d1-eqiadethenet-1/28

@cmooney @RobH Finished A8 LSW, spine management, and SCS cabling. Updated the SCS port labels and Google Sheet. Adjusted the baud rate and confirmed everything worked.

@cmooney @RobH Finished A8 LSW, spine management, and SCS cabling. Updated the SCS port labels and Google Sheet. Adjusted the baud rate and confirmed everything worked.

Thanks @Jclark-ctr. Confirmed that both are reachable via console, although they are connected to the opposite scs ports than on the sheet which caused some confusion. I've updated everything now but please check the below cable IDs are correct, they may need to be swapped around I left them alone:

https://netbox.wikimedia.org/dcim/console-server-ports/172/trace/
https://netbox.wikimedia.org/dcim/console-server-ports/170/trace/

In terms of the ports on ssw1-a8-eqiad to the other row a/b switches we appear to mostly look ok.

A:cmooney@ssw1-a8-eqiad# show interface * brief | grep -v DISABLED
+---------------+-------------+------------+-------+-------------------------+-----------------------------------+
| Port          | Admin State | Oper State | Speed | Type                    | Description                       |
+===============+=============+============+=======+=========================+===================================+
| ethernet-1/1  | enable      | down       | 100G  |                         | Core: lsw1-a1-eqiad:ethernet-1/55 |
| ethernet-1/2  | enable      | up         | 100G  | 100G CWDM4 MSA with FEC | Core: lsw1-a2-eqiad:ethernet-1/55 |
| ethernet-1/3  | enable      | up         | 100G  | 100G CWDM4 MSA with FEC | Core: lsw1-a3-eqiad:ethernet-1/55 |
| ethernet-1/4  | enable      | up         | 100G  | 100G CWDM4 MSA with FEC | Core: lsw1-a4-eqiad:ethernet-1/55 |
| ethernet-1/5  | enable      | up         | 100G  | 100G CWDM4 MSA with FEC | Core: lsw1-a5-eqiad:ethernet-1/55 |
| ethernet-1/6  | enable      | up         | 100G  | 100G CWDM4 MSA with FEC | Core: lsw1-a6-eqiad:ethernet-1/55 |
| ethernet-1/7  | enable      | up         | 100G  | 100G CWDM4 MSA with FEC | Core: lsw1-a7-eqiad:ethernet-1/55 |
| ethernet-1/8  | enable      | up         | 100G  | 100G CWDM4 MSA with FEC | Core: lsw1-a8-eqiad:ethernet-1/55 |
| ethernet-1/9  | enable      | up         | 100G  | 100G CWDM4 MSA with FEC | Core: lsw1-b1-eqiad:ethernet-1/55 |
| ethernet-1/10 | enable      | up         | 100G  | 100G CWDM4 MSA with FEC | Core: lsw1-b2-eqiad:ethernet-1/55 |
| ethernet-1/11 | enable      | up         | 100G  | 100G CWDM4 MSA with FEC | Core: lsw1-b3-eqiad:ethernet-1/55 |
| ethernet-1/12 | enable      | up         | 100G  | 100G CWDM4 MSA with FEC | Core: lsw1-b4-eqiad:ethernet-1/55 |
| ethernet-1/13 | enable      | up         | 100G  | 100G CWDM4 MSA with FEC | Core: lsw1-b5-eqiad:ethernet-1/55 |
| ethernet-1/14 | enable      | up         | 100G  | 100G CWDM4 MSA with FEC | Core: lsw1-b6-eqiad:ethernet-1/55 |
| ethernet-1/15 | enable      | up         | 100G  | 100G CWDM4 MSA with FEC | Core: lsw1-b7-eqiad:ethernet-1/55 |
| ethernet-1/16 | enable      | up         | 100G  | 100G CWDM4 MSA with FEC | Core: lsw1-b8-eqiad:ethernet-1/55 |
| ethernet-1/28 | enable      | down       | 100G  |                         | Core: ssw1-d8-eqiad:ethernet-1/28 |
| ethernet-1/29 | enable      | down       | 100G  |                         | Core: ssw1-d1-eqiad:ethernet-1/28 |
| ethernet-1/30 | enable      | down       | 100G  |                         | Core: ssw1-e1-eqiad:et-0/0/27     |
| ethernet-1/31 | enable      | down       | 100G  |                         | Core: ssw1-f1-eqiad:et-0/0/27     |
| ethernet-1/32 | enable      | down       | 100G  |                         | Core: cr2-eqiad:et-0/1/0          |
A:cmooney@ssw1-a8-eqiad# show system lldp neighbor interface *
+---------------+-------------------+----------------------+---------------------+---------------+----------------+---------------+
| Name          | Neighbor          | Neighbor System Name | Neighbor Chassis ID | First Message | Last Update    | Neighbor Port |
+===============+===================+======================+=====================+===============+================+===============+
| ethernet-1/2  | 88:18:F1:C8:0B:1C | lsw1-a2-eqiad        | 88:18:F1:C8:0B:1C   | 8 minutes ago | 24 seconds ago | ethernet-1/55 |
| ethernet-1/3  | 88:18:F1:C8:0F:1C | lsw1-a3-eqiad        | 88:18:F1:C8:0F:1C   | 8 minutes ago | 24 seconds ago | ethernet-1/55 |
| ethernet-1/4  | 88:18:F1:C7:FF:1C | lsw1-a4-eqiad        | 88:18:F1:C7:FF:1C   | 8 minutes ago | 24 seconds ago | ethernet-1/55 |
| ethernet-1/5  | 88:18:F1:C8:1D:1C | lsw1-a5-eqiad        | 88:18:F1:C8:1D:1C   | 8 minutes ago | 24 seconds ago | ethernet-1/55 |
| ethernet-1/6  | 88:18:F1:C8:13:1C | lsw1-a6-eqiad        | 88:18:F1:C8:13:1C   | 8 minutes ago | 24 seconds ago | ethernet-1/55 |
| ethernet-1/7  | 88:18:F1:C8:1B:1C | lsw1-a7-eqiad        | 88:18:F1:C8:1B:1C   | 8 minutes ago | 24 seconds ago | ethernet-1/55 |
| ethernet-1/8  | 88:18:F1:C8:11:1C | lsw1-a8-eqiad        | 88:18:F1:C8:11:1C   | 8 minutes ago | 29 seconds ago | ethernet-1/55 |
| ethernet-1/9  | 88:18:F1:C8:17:1C | lsw1-b1-eqiad        | 88:18:F1:C8:17:1C   | 8 minutes ago | 24 seconds ago | ethernet-1/55 |
| ethernet-1/10 | 88:18:F1:C8:19:1C | lsw1-b2-eqiad        | 88:18:F1:C8:19:1C   | 8 minutes ago | 24 seconds ago | ethernet-1/55 |
| ethernet-1/11 | 88:18:F1:C8:1F:1C | lsw1-b3-eqiad        | 88:18:F1:C8:1F:1C   | 8 minutes ago | 24 seconds ago | ethernet-1/55 |
| ethernet-1/12 | 88:18:F1:C7:FB:1C | lsw1-b4-eqiad        | 88:18:F1:C7:FB:1C   | 8 minutes ago | 24 seconds ago | ethernet-1/55 |
| ethernet-1/13 | 94:4F:DB:90:D3:8E | lsw1-b5-eqiad        | 94:4F:DB:90:D3:8E   | 8 minutes ago | 24 seconds ago | ethernet-1/55 |
| ethernet-1/14 | 94:4F:DB:90:83:8E | lsw1-b6-eqiad        | 94:4F:DB:90:83:8E   | 8 minutes ago | 24 seconds ago | ethernet-1/55 |
| ethernet-1/15 | 88:18:F1:C8:2F:1C | lsw1-b7-eqiad        | 88:18:F1:C8:2F:1C   | 8 minutes ago | 24 seconds ago | ethernet-1/55 |
| ethernet-1/16 | 88:18:F1:C8:2B:1C | lsw1-b8-eqiad        | 88:18:F1:C8:2B:1C   | 8 minutes ago | 24 seconds ago | ethernet-1/55 |
| mgmt0         | 28:80:88:6E:BE:E0 |                      | 28:80:88:6E:BE:E0   | 8 minutes ago | 17 seconds ago | g42           |
+---------------+-------------------+----------------------+---------------------+---------------+----------------+---------------+

All the links are going to the right places so other than that we are ok. BGP and OSPF came right up so in the main we are looking good.

The following needs to be looked at:

  • The link in port 1 to lsw1-a1-eqiad is down, no QSFP detected, might just need a re-seat
  • The link to the CR and spines in other rows are all down, no QSFP module in those ports I think?

Finished cabling for the A/B upgrade. Everything is complete except for 1 cross-connect between the cages Cables are pre ran though. Additionally cabled lsw1-C1 Adjusting rack positions so scs-c1 is above lsw and mgmt

NetworkDevicePortConnected ToRemote PortCable / CircuitStatus
----------------------------------------------------------------------------------------------------------------------------------------------------------------:-------:
Networkssw1-a8-eqiadethernet-1/32cr2-eqiadet-0/1/0G2603236912003237TRUE
Networkssw1-a8-eqiadethernet-1/29ssw1-d1-eqiadethernet-1/28G2603313179000219TRUE
Networkssw1-a8-eqiadethernet-1/28ssw1-d8-eqiadethernet-1/28G2305276506010882TRUE
Networkssw1-a8-eqiadethernet-1/30ssw1-e1-eqiadet-0/0/27G2511115191000157; pp21989996; G2104265533000513TRUE
Networkssw1-a8-eqiadethernet-1/31ssw1-f1-eqiadet-0/0/27G2511115191000160; short 1 xconnect; 1110072026FALSE
Networkssw1-a8-eqiadethernet-1/1lsw1-a1-eqiadethernet-1/55G2603236787000068TRUE
Networkssw1-a1-eqiadethernet-1/30ssw1-e1-eqiadet-0/0/28et28; G2410263877000770; pp23324919; G2506063094000218TRUE
Networkssw1-a1-eqiadethernet-1/31ssw1-f1-eqiadet-0/0/28et28; G2506063094000063; pp23324918; G2410263877000745TRUE
Networkssw1-d1-eqiadethernet-1/1lsw1-c1-eqiadethernet-1/56G2603236787000466TRUE
Networkssw1-d8-eqiadethernet-1/1lsw1-c1-eqiadethernet-1/55G2603236908000978TRUE
Serialscs-c1-eqiad25lsw1-c1-eqiadconsole10082026TRUE

A1 was not cabled I have updated netbox for cableid's for all the uplinks except the spine links since they are not setup.

Updated the remaining links between E/F spines to A1/A8 spine in netbox

all of this info is on the google sheet, so resolving this task