Background
This task is intended to capture what data wiring is needed to answer if this feature met its goals.
Measurement Goals
See EPIC
Link to Finalized Designs
NOTE: the Game will be split up into multiple releases. See the forecasting doc to see what is planned for Release 1 vs Release 2
Tasks
- @ PM Add link to final designs
- @Analyst Create measurement plan & schema Doc
- @Analyst Move ticket to “Needs engineering sync” for engineers to estimate & implement instrumentation
- @Engineers instrument according to deck
- @analyst Create validation task after Beta release
Test Steps
Build: TestFlight 8.2.0 (latest).
- Enable dev settings toggle "Send analytics to wmflabs".
- Go to https://stream.wikimedia.beta.wmflabs.org/v2/ui/#/
Watch for events with Stream: "product_metrics.app_base", Instrument name: apps-games