Forking from T427393: EQSIN: Setup VRRP on both routers for the new subnets
This is a requirement for the switch replacement as the new network design have per rack subnets.
That will make the switch replacement much more smooth and minimize downtime as reimages/re-IP won't be necessary *after* the work.
TL;DR; please run the reimage cookbook with --move-vlan on them.
If they can't be reimaged, then the move-vlan cookbook with --inplace (but only if a re-image isn't possible).
- cp5018
- cp5020
- cp5024
- cp5026
- cp5028
- cp5030
- cp5032
- dns5004
- ganeti5004
- ganeti5006
- lvs5005
https://netbox.wikimedia.org/dcim/devices/?rack_id=78&status=active&role_id=1