Page MenuHomePhabricator

VPuffetMichel (Val)
User

Today

  • No visible events.

Tomorrow

  • No visible events.

Monday

  • No visible events.

User Details

User Since
Aug 17 2021, 7:11 PM (243 w, 3 d)
Availability
Available
LDAP User
Unknown
MediaWiki User
VPuffetMichel (WMF) [ Global Accounts ]

Recent Activity

Thu, Apr 16

VPuffetMichel closed T422156: Wikimedia\Rdbms\DBQueryError: Error 1054: Unknown column 'articles_added' in 'WHERE'Function: MediaWiki\Pager\IndexPager::buildQueryInfo (MediaWiki\Extension\CampaignEvents\Pager\EventContributionsEditorsPager) as Resolved.
Thu, Apr 16, 6:24 PM · MW-1.46-notes (1.46.0-wmf.26; 2026-04-28), Connection-Team (Connection-Current-Sprint), CampaignEvents, Wikimedia-production-error
VPuffetMichel closed T420250: Investigation: Worklist support for collaborative contributions & event discovery as Resolved.
Thu, Apr 16, 6:17 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Event-Discovery, Campaign-Registration, OKR-Work, CampaignEvents
VPuffetMichel closed T419603: Investigation: Develop prototype for surfacing relevant events in post-publication dialog based on topical interest as Resolved.
Thu, Apr 16, 6:17 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Event-Discovery, OKR-Work, CampaignEvents
VPuffetMichel closed T419748: Investigation: Develop prototype to promote relevant events/WikiProjects on event page as Resolved.
Thu, Apr 16, 6:17 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Event-Discovery, OKR-Work, CampaignEvents
VPuffetMichel closed T416519: Investigation: Recommend relevant WikiProjects to editors as Resolved.
Thu, Apr 16, 6:17 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, Event-Discovery, CampaignEvents
VPuffetMichel moved T419748: Investigation: Develop prototype to promote relevant events/WikiProjects on event page from Done 🏁 to Epic sign-off 🖌️ on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 6:17 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Event-Discovery, OKR-Work, CampaignEvents
VPuffetMichel closed T419745: Investigation: Develop a prototype for surfacing relevant events on watchlist as Resolved.
Thu, Apr 16, 6:17 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Event-Discovery, CampaignEvents, OKR-Work
VPuffetMichel moved T419603: Investigation: Develop prototype for surfacing relevant events in post-publication dialog based on topical interest from Done 🏁 to Epic sign-off 🖌️ on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 6:17 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Event-Discovery, OKR-Work, CampaignEvents
VPuffetMichel moved T419745: Investigation: Develop a prototype for surfacing relevant events on watchlist from Done 🏁 to Epic sign-off 🖌️ on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 6:16 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Event-Discovery, CampaignEvents, OKR-Work
VPuffetMichel moved T420250: Investigation: Worklist support for collaborative contributions & event discovery from Done 🏁 to Epic sign-off 🖌️ on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 6:16 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Event-Discovery, Campaign-Registration, OKR-Work, CampaignEvents
VPuffetMichel moved T416519: Investigation: Recommend relevant WikiProjects to editors from Done 🏁 to Epic sign-off 🖌️ on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 6:16 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, Event-Discovery, CampaignEvents
VPuffetMichel moved T420250: Investigation: Worklist support for collaborative contributions & event discovery from Code Review 💬 to Done 🏁 on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 5:32 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Event-Discovery, Campaign-Registration, OKR-Work, CampaignEvents
VPuffetMichel moved T416519: Investigation: Recommend relevant WikiProjects to editors from Code Review 💬 to Done 🏁 on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 5:32 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, Event-Discovery, CampaignEvents
VPuffetMichel moved T419748: Investigation: Develop prototype to promote relevant events/WikiProjects on event page from Code Review 💬 to Done 🏁 on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 5:32 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Event-Discovery, OKR-Work, CampaignEvents
VPuffetMichel moved T419603: Investigation: Develop prototype for surfacing relevant events in post-publication dialog based on topical interest from Code Review 💬 to Done 🏁 on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 5:32 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Event-Discovery, OKR-Work, CampaignEvents
VPuffetMichel moved T419745: Investigation: Develop a prototype for surfacing relevant events on watchlist from Code Review 💬 to Done 🏁 on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 5:32 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Event-Discovery, CampaignEvents, OKR-Work
VPuffetMichel moved T419603: Investigation: Develop prototype for surfacing relevant events in post-publication dialog based on topical interest from Upcoming / refining 💡 to Code Review 💬 on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 2:52 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Event-Discovery, OKR-Work, CampaignEvents
VPuffetMichel edited projects for T419603: Investigation: Develop prototype for surfacing relevant events in post-publication dialog based on topical interest, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team.
Thu, Apr 16, 2:52 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Event-Discovery, OKR-Work, CampaignEvents
VPuffetMichel edited projects for T419603: Investigation: Develop prototype for surfacing relevant events in post-publication dialog based on topical interest, added: Connection-Team; removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 2:51 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Event-Discovery, OKR-Work, CampaignEvents
VPuffetMichel moved T419748: Investigation: Develop prototype to promote relevant events/WikiProjects on event page from Upcoming / refining 💡 to Code Review 💬 on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 2:50 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Event-Discovery, OKR-Work, CampaignEvents
VPuffetMichel edited projects for T419748: Investigation: Develop prototype to promote relevant events/WikiProjects on event page, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team.
Thu, Apr 16, 2:50 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Event-Discovery, OKR-Work, CampaignEvents
VPuffetMichel edited projects for T419748: Investigation: Develop prototype to promote relevant events/WikiProjects on event page, added: Connection-Team; removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 2:49 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Event-Discovery, OKR-Work, CampaignEvents
VPuffetMichel moved T419745: Investigation: Develop a prototype for surfacing relevant events on watchlist from Upcoming / refining 💡 to Code Review 💬 on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 2:48 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Event-Discovery, CampaignEvents, OKR-Work
VPuffetMichel edited projects for T419745: Investigation: Develop a prototype for surfacing relevant events on watchlist, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team.
Thu, Apr 16, 2:48 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Event-Discovery, CampaignEvents, OKR-Work
VPuffetMichel edited projects for T419745: Investigation: Develop a prototype for surfacing relevant events on watchlist, added: Connection-Team; removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 2:48 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Event-Discovery, CampaignEvents, OKR-Work
VPuffetMichel moved T416519: Investigation: Recommend relevant WikiProjects to editors from Upcoming / refining 💡 to Code Review 💬 on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 2:47 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, Event-Discovery, CampaignEvents
VPuffetMichel edited projects for T416519: Investigation: Recommend relevant WikiProjects to editors, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team.
Thu, Apr 16, 2:46 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, Event-Discovery, CampaignEvents
VPuffetMichel edited projects for T416519: Investigation: Recommend relevant WikiProjects to editors, added: Connection-Team; removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 2:46 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, Event-Discovery, CampaignEvents
VPuffetMichel moved T422168: MediaWiki\Extension\CampaignEvents\MWEntity\UserNotGlobalException: User with local ID 0 does not have a global account. from Upcoming / refining 💡 to Code Review 💬 on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 2:45 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, CampaignEvents, Wikimedia-production-error
VPuffetMichel edited projects for T422168: MediaWiki\Extension\CampaignEvents\MWEntity\UserNotGlobalException: User with local ID 0 does not have a global account., added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team.
Thu, Apr 16, 2:44 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, CampaignEvents, Wikimedia-production-error
VPuffetMichel edited projects for T422168: MediaWiki\Extension\CampaignEvents\MWEntity\UserNotGlobalException: User with local ID 0 does not have a global account., added: Connection-Team; removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 2:44 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, CampaignEvents, Wikimedia-production-error
VPuffetMichel moved T422158: PHP Warning: Undefined array key "entities" from Upcoming / refining 💡 to Code Review 💬 on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 2:43 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, WikimediaCampaignEvents, Wikimedia-production-error
VPuffetMichel edited projects for T422158: PHP Warning: Undefined array key "entities", added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team.
Thu, Apr 16, 2:43 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, WikimediaCampaignEvents, Wikimedia-production-error
VPuffetMichel edited projects for T422158: PHP Warning: Undefined array key "entities", added: Connection-Team; removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 2:43 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, WikimediaCampaignEvents, Wikimedia-production-error
VPuffetMichel moved T420250: Investigation: Worklist support for collaborative contributions & event discovery from Upcoming / refining 💡 to Code Review 💬 on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 2:39 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Event-Discovery, Campaign-Registration, OKR-Work, CampaignEvents
VPuffetMichel edited projects for T420250: Investigation: Worklist support for collaborative contributions & event discovery, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team.
Thu, Apr 16, 2:39 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Event-Discovery, Campaign-Registration, OKR-Work, CampaignEvents
VPuffetMichel removed a project from T420250: Investigation: Worklist support for collaborative contributions & event discovery: Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 2:39 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Event-Discovery, Campaign-Registration, OKR-Work, CampaignEvents
VPuffetMichel moved T420040: Create new Superset charts for goal-setting from Upcoming / refining 💡 to Code Review 💬 on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 2:28 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, CampaignEvents
VPuffetMichel edited projects for T420040: Create new Superset charts for goal-setting, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team.
Thu, Apr 16, 2:27 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, CampaignEvents
VPuffetMichel removed a project from T420040: Create new Superset charts for goal-setting: Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 2:27 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, CampaignEvents
VPuffetMichel moved T413396: Add edit to this event dialog should show error if edit has already been added from Upcoming / refining 💡 to Code Review 💬 on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 2:27 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), MW-1.46-notes (1.46.0-wmf.22; 2026-03-31), Patch-For-Review, CampaignEvents
VPuffetMichel added a project to T413396: Add edit to this event dialog should show error if edit has already been added: Connection-Team (Connection-Q4-13Apr-24Apr-2026).
Thu, Apr 16, 2:26 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), MW-1.46-notes (1.46.0-wmf.22; 2026-03-31), Patch-For-Review, CampaignEvents
VPuffetMichel removed a project from T413396: Add edit to this event dialog should show error if edit has already been added: Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 2:26 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), MW-1.46-notes (1.46.0-wmf.22; 2026-03-31), Patch-For-Review, CampaignEvents
VPuffetMichel moved T422545: Investigation: Learn how Test Kitchen works from Upcoming / refining 💡 to Code Review 💬 on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 2:26 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, OKR-Work
VPuffetMichel added a project to T422545: Investigation: Learn how Test Kitchen works: Connection-Team (Connection-Q4-13Apr-24Apr-2026).
Thu, Apr 16, 2:25 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, OKR-Work
VPuffetMichel removed a project from T422545: Investigation: Learn how Test Kitchen works: Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 2:25 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, OKR-Work
VPuffetMichel edited projects for T421749: Deploy CampaignEvents to Wikimedia Incubator, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team.
NOTE: Remove any sections that are not needed.
Thu, Apr 16, 2:22 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), incubator.wikimedia.org, Patch-For-Review, Wikimedia-Extension-setup, OKR-Work, CampaignEvents
VPuffetMichel edited projects for T423388: Add the cec_references_delta column to ce_event_contributions, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team.
Thu, Apr 16, 2:22 PM · MW-1.46-notes (1.46.0-wmf.26; 2026-04-28), Data-Persistence, Connection-Team (Connection-Q4-13Apr-24Apr-2026), Schema-change, Patch-For-Review, OKR-Work, CampaignEvents
VPuffetMichel edited projects for T422844: The same edit can be associated with a given event multiple times, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team.
Thu, Apr 16, 2:21 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Essential-Work, CampaignEvents
VPuffetMichel edited projects for T419742: Investigation: Add quality progress, potential needs, and topics to worklist, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team.
Thu, Apr 16, 2:21 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, CampaignEvents
VPuffetMichel edited projects for T411681: Add references added/removed to Contributions tab, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team.
Thu, Apr 16, 2:20 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, OKR-Work, CampaignEvents
VPuffetMichel edited projects for T421749: Deploy CampaignEvents to Wikimedia Incubator, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 2:19 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), incubator.wikimedia.org, Patch-For-Review, Wikimedia-Extension-setup, OKR-Work, CampaignEvents
VPuffetMichel edited projects for T411681: Add references added/removed to Contributions tab, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 2:19 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, OKR-Work, CampaignEvents
VPuffetMichel edited projects for T419742: Investigation: Add quality progress, potential needs, and topics to worklist, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 2:19 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, CampaignEvents
VPuffetMichel edited projects for T422844: The same edit can be associated with a given event multiple times, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 2:19 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Essential-Work, CampaignEvents
VPuffetMichel edited projects for T423388: Add the cec_references_delta column to ce_event_contributions, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 2:19 PM · MW-1.46-notes (1.46.0-wmf.26; 2026-04-28), Data-Persistence, Connection-Team (Connection-Q4-13Apr-24Apr-2026), Schema-change, Patch-For-Review, OKR-Work, CampaignEvents
VPuffetMichel moved T414017: Design exploration: Collect more data points on events (to be used for the Community Update module) from Upcoming / refining 💡 to Design in progress ✏️ on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 2:16 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Event-Discovery, OKR-Work, CampaignEvents
VPuffetMichel edited projects for T414017: Design exploration: Collect more data points on events (to be used for the Community Update module), added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team.
Thu, Apr 16, 2:16 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Event-Discovery, OKR-Work, CampaignEvents
VPuffetMichel removed a project from T414017: Design exploration: Collect more data points on events (to be used for the Community Update module): Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 2:15 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Event-Discovery, OKR-Work, CampaignEvents
VPuffetMichel moved T404467: Design exploration: Collaborative tracking against a worklist from Upcoming / refining 💡 to Design in progress ✏️ on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 2:15 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), CampaignEvents, OKR-Work
VPuffetMichel added a project to T404467: Design exploration: Collaborative tracking against a worklist: Connection-Team (Connection-Q4-13Apr-24Apr-2026).
Thu, Apr 16, 2:15 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), CampaignEvents, OKR-Work
VPuffetMichel removed a project from T404467: Design exploration: Collaborative tracking against a worklist: Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 2:14 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), CampaignEvents, OKR-Work
VPuffetMichel moved T414733: Design sprint: Increase event discoverability within common editor workflows from Upcoming / refining 💡 to Design in progress ✏️ on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 2:14 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, Event-Discovery, CampaignEvents
VPuffetMichel edited projects for T414733: Design sprint: Increase event discoverability within common editor workflows, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team.
Thu, Apr 16, 2:14 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, Event-Discovery, CampaignEvents
VPuffetMichel edited projects for T414733: Design sprint: Increase event discoverability within common editor workflows, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 2:13 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, Event-Discovery, CampaignEvents
VPuffetMichel moved T422733: Design: Develop MVP designs for event discovery via article matches from Upcoming / refining 💡 to Needs design on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 2:08 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, Event-Discovery, CampaignEvents
VPuffetMichel moved T421950: Design exploration: Expand impact module for new audiences & regular reports from Upcoming / refining 💡 to Needs design on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 2:08 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, CampaignEvents
VPuffetMichel moved T419750: Design exploration: Quality score support for collaborative contributions from Upcoming / refining 💡 to Needs design on the Connection-Team (Connection-Q4-13Apr-24Apr-2026) board.
Thu, Apr 16, 2:08 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), CampaignEvents, OKR-Work
VPuffetMichel edited projects for T419750: Design exploration: Quality score support for collaborative contributions, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team.
Thu, Apr 16, 2:07 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), CampaignEvents, OKR-Work
VPuffetMichel edited projects for T422733: Design: Develop MVP designs for event discovery via article matches, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team.
Thu, Apr 16, 2:06 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, Event-Discovery, CampaignEvents
VPuffetMichel edited projects for T421950: Design exploration: Expand impact module for new audiences & regular reports, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team.
Thu, Apr 16, 2:03 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, CampaignEvents
VPuffetMichel edited projects for T421950: Design exploration: Expand impact module for new audiences & regular reports, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 1:57 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, CampaignEvents
VPuffetMichel edited projects for T422733: Design: Develop MVP designs for event discovery via article matches, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 1:57 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, Event-Discovery, CampaignEvents
VPuffetMichel edited projects for T419750: Design exploration: Quality score support for collaborative contributions, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 1:57 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), CampaignEvents, OKR-Work
VPuffetMichel edited projects for T347501: [EPIC] Allow organizer to specify supported languages of event, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 1:56 PM · Connection-Team, Epic, CampaignEvents, Campaign-Registration
VPuffetMichel edited projects for T353200: Event Notifications based on Editor Interest, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 1:56 PM · Connection-Team, Growth-Team
VPuffetMichel edited projects for T358493: Participant can add event details to external calendar via registration confirmation email (Google Calendar) - IANA format, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 1:56 PM · Connection-Team, Patch-For-Review, CampaignEvents, Campaign-Registration
VPuffetMichel edited projects for T419888: Show a message when the event goal exceeds 100%., added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 1:56 PM · Connection-Team, OKR-Work, CampaignEvents
VPuffetMichel edited projects for T421276: Prevent users from setting goals if event is over, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 1:56 PM · Connection-Team, CampaignEvents
VPuffetMichel edited projects for T420256: Allow all users to see full goal progress if at least 5 private participant editors, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 1:56 PM · Connection-Team, OKR-Work, CampaignEvents
VPuffetMichel edited projects for T417844: Investigation: Develop a prototype to send event notifications based on editor interest, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 1:56 PM · Connection-Team, OKR-Work, Event-Discovery, CampaignEvents
VPuffetMichel edited projects for T410943: Add start/end time filters to Collaboration List, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 1:55 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), Patch-For-Review, Event-Discovery, CampaignEvents
VPuffetMichel edited projects for T411429: Add progress bar to post-publication dialog, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 1:55 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, CampaignEvents
VPuffetMichel edited projects for T411428: Add progress bar to event page, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 1:55 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, CampaignEvents
VPuffetMichel edited projects for T422165: TypeError: MediaWiki\Extension\CampaignEvents\Special\AbstractEventRegistrationSpecialPage::parseSubmittedTimezone(): Argument #1 ($rawVal) must be of type string, null given, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 1:55 PM · Connection-Team, CampaignEvents, Wikimedia-production-error
VPuffetMichel edited projects for T411830: Investigation: Add ability to track uploads in Collaborative Contributions, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 1:55 PM · Connection-Team, OKR-Work, CampaignEvents
VPuffetMichel edited projects for T411426: Add progress bar to Contributions tab, added: Connection-Team (Connection-Q4-13Apr-24Apr-2026); removed Connection-Team (Connection-Current-Sprint).
Thu, Apr 16, 1:55 PM · Connection-Team (Connection-Q4-13Apr-24Apr-2026), OKR-Work, CampaignEvents

Wed, Apr 15

VPuffetMichel edited projects for T406836: The Edit Check's SLO has burned all its error budget, added: Editing-team (Editing-Q4-27Apr-8May-2026); removed Editing-team (Editing-current-Q4-13Apr-24Apr-2026).
Wed, Apr 15, 5:46 PM · Editing-team (Editing-Q4-27Apr-8May-2026), OKR-Work, Goal, EditCheck
VPuffetMichel moved T406836: The Edit Check's SLO has burned all its error budget from Decision to be made to Blocked on the Editing-team (Editing-current-Q4-13Apr-24Apr-2026) board.
Wed, Apr 15, 5:42 PM · Editing-team (Editing-Q4-27Apr-8May-2026), OKR-Work, Goal, EditCheck
VPuffetMichel edited projects for T423465: [SPIKE] Investigate creating a top-level model class for Edit Check, added: Editing-team (Editing-Q4-11May-22May-2026); removed Editing-team (Editing-current-Q4-13Apr-24Apr-2026).

Moving this task to a later sprint.

Wed, Apr 15, 5:38 PM · Editing-team (Editing-Q4-11May-22May-2026), EditCheck
VPuffetMichel moved T422835: Revise Tone tasks are warning users with "Experimental edit check. For testing purposes only." warning from Ready for Sign Off to Blocked / Needs More Work on the Editing-team (Editing-Q4-30Mar-10Apr-2026) board.
Wed, Apr 15, 5:33 PM · Editing-team (Editing-Q4-30Mar-10Apr-2026), Unplanned-Sprint-Work, MW-1.46-notes (1.46.0-wmf.23; 2026-04-07), Patch-For-Review, Growth-Team (FY2025-26 Q4 Sprint 1), GrowthExperiments-NewcomerTasks, Revise-Tone-Structured-Task
VPuffetMichel moved T422835: Revise Tone tasks are warning users with "Experimental edit check. For testing purposes only." warning from Decision to be made to Ready for Sign Off on the Editing-team (Editing-Q4-30Mar-10Apr-2026) board.
Wed, Apr 15, 5:33 PM · Editing-team (Editing-Q4-30Mar-10Apr-2026), Unplanned-Sprint-Work, MW-1.46-notes (1.46.0-wmf.23; 2026-04-07), Patch-For-Review, Growth-Team (FY2025-26 Q4 Sprint 1), GrowthExperiments-NewcomerTasks, Revise-Tone-Structured-Task
VPuffetMichel edited projects for T422835: Revise Tone tasks are warning users with "Experimental edit check. For testing purposes only." warning, added: Editing-team (Editing-Q4-30Mar-10Apr-2026); removed Editing-team (Editing-current-Q4-13Apr-24Apr-2026).
Wed, Apr 15, 5:30 PM · Editing-team (Editing-Q4-30Mar-10Apr-2026), Unplanned-Sprint-Work, MW-1.46-notes (1.46.0-wmf.23; 2026-04-07), Patch-For-Review, Growth-Team (FY2025-26 Q4 Sprint 1), GrowthExperiments-NewcomerTasks, Revise-Tone-Structured-Task
VPuffetMichel moved T422274: False positive yearLink check from Decision to be made to Ready for Dev on the Editing-team (Editing-current-Q4-13Apr-24Apr-2026) board.
Wed, Apr 15, 5:26 PM · Editing-team (Editing-current-Q4-13Apr-24Apr-2026), VisualEditor Suggestion Mode
VPuffetMichel edited projects for T422274: False positive yearLink check, added: Editing-team (Editing-current-Q4-13Apr-24Apr-2026); removed Editing-team (Planning).
Wed, Apr 15, 5:25 PM · Editing-team (Editing-current-Q4-13Apr-24Apr-2026), VisualEditor Suggestion Mode
VPuffetMichel edited projects for T406836: The Edit Check's SLO has burned all its error budget, added: Editing-team (Editing-current-Q4-13Apr-24Apr-2026); removed Editing-team (Editing-Q4-30Mar-10Apr-2026).
Wed, Apr 15, 4:59 PM · Editing-team (Editing-Q4-27Apr-8May-2026), OKR-Work, Goal, EditCheck
VPuffetMichel renamed Editing-team (Editing-current-Q4-13Apr-24Apr-2026) from Editing-Q4-13Apr-24Apr-2026 to Editing-current-Q4-13Apr-24Apr-2026.
Wed, Apr 15, 4:38 PM

Tue, Apr 14

VPuffetMichel changed the status of T422730: Develop an API that enables Edit Checks/Suggestions to be kept in sync with Growth Experiments from Open to In Progress.
Tue, Apr 14, 5:26 PM · MW-1.46-notes (1.46.0-wmf.24; 2026-04-14), Patch-For-Review, Growth-Team, Editing-team (Editing-current-Q4-13Apr-24Apr-2026), OKR-Work, VisualEditor Suggestion Mode, Add-Link-Structured-Task
VPuffetMichel changed the status of T422730: Develop an API that enables Edit Checks/Suggestions to be kept in sync with Growth Experiments, a subtask of T421968: [Suggestion] Deploy "Add a link" suggestion as a default-on suggestion, from Open to In Progress.
Tue, Apr 14, 5:26 PM · Design, Editing-team (Editing-current-Q4-13Apr-24Apr-2026), OKR-Work, VisualEditor Suggestion Mode
VPuffetMichel assigned T422730: Develop an API that enables Edit Checks/Suggestions to be kept in sync with Growth Experiments to DLynch.
Tue, Apr 14, 5:25 PM · MW-1.46-notes (1.46.0-wmf.24; 2026-04-14), Patch-For-Review, Growth-Team, Editing-team (Editing-current-Q4-13Apr-24Apr-2026), OKR-Work, VisualEditor Suggestion Mode, Add-Link-Structured-Task