This task will track the migration of the ps1 and ps2 to be replaced with new PDUs in rack [[ https://netbox.wikimedia.org/dcim/racks/5/ | A5-eqiad ]].
Each server & switch will need to have potential downtime scheduled, since this will be a live power change of the PDU towers.
These racks have a single tower for the old PDU (with and A and B side), with the new PDUs having independent A and B towers.
[] - schedule downtime for the entire list of switches and servers.
[] - Wire up one of the two towers, energize, and relocate power to it from existing/old pdu tower (now de-energized).
[] - confirm entire list of switches, routers, and servers have had their power restored from the new pdu tower
[] - Once new PDU tower is confirmed online, move on to next steps.
[] - Wire up remaining tower, energize, and relocate power to it from existing/old pdu tower (now de-energized).
[] - confirm entire list of switches, routers, and servers have had their power restored from the new pdu tower
== List of routers, switches, and servers ==
| device | role | SRE team coordination
| asw2-a5-eqiad | asw | @ayounsi
| ex4300-spare1-eqiad | spare | @ ayounsi
| lvs1009 | lvs | #traffic
| lvs1008 | lvs | #traffic
| lvs1007 | lvs | #traffic
| restbase1020 | | @fgiunchedi
| ores1002
| ganeti1008 | ganeti node | @akosiaris
| analytics1071 | |
| wtp1030
| wtp1029
| wtp1028
| db1128 | db | #dba
| sessionstore1001
| cp1068 | cp | #traffic
| cp1067 | cp | #traffic
| cp1066 | cp | #traffic
| cp1065 | cp | #traffic
| cp1064 | cp | #traffic
| cp1063 | cp | #traffic
| cp1062 | cp | #traffic
| cp1061 | cp | #traffic
| cp1059 | cp | #traffic
| cp1058 | cp | #traffic
| dbproxy1012 | dbproxy | #dba
| mw1266 | mw |
| mw1265 | mw |
| mw1264 | mw |
| mw1263 | mw |
| mw1262 | mw |
| mw1261 | mw |