To give us basic visibility into how users interact with the incident reporting system, we want to set up the instrumentation that covers the events in the emergency reporting workflow.
Design doc: https://www.figma.com/design/ZfMGm4XFZy49GlYyINacaK/IRS-MVP-v1?node-id=2007-7869&t=M9Kwk9rpD4330H6S-0
## Acceptance criteria
- [ ] Connie w/ Madalina: Measurement plan defining metrics
- [ ] Connie: Instrumentation specification
- [ ] Connie: Log this in [[ https://docs.google.com/forms/d/e/1FAIpQLSc8TxVpVp5gAI2zfVBrYoNYPDtZm9w1b1ePox63H_oUb6u1aA/viewform | the data collection activity form ]] (per [[ https://foundation.wikimedia.org/wiki/Legal:Data_Collection_Guidelines | Data Collection Guidelines ]])
- [ ] Engineer: Implementation of the specification
- [ ] Engineer: Instrumentation QA (pre-deployment and post-deployment)
- [ ] Connie: post-deployment data QA
## Document