#### Background
This task is intended to capture what data wiring is needed to answer if this feature met its goals.
##### Measurement Goals
See EPIC
##### Link to Finalized Designs
- https://www.figma.com/design/OQOBB3jC1hg9Ezz53sY7ER/iOS-%E2%80%94%C2%A0Games?node-id=0-1&p=f&t=y4RIGKTjEChXlyGr-0
NOTE: the Game will be split up into multiple releases. See the [[ https://docs.google.com/spreadsheets/d/1i1inQB4xdMe0bg8aFSOy4gqAisWOr9xLO54bTxnqWZc/edit?gid=1107896875#gid=1107896875 | forecasting doc ]] to see what is planned for Release 1 vs Release 2
####Tasks
[x] @ PM Add link to final designs
[x] @Analyst Create measurement plan & schema Doc
[x] @Analyst Move ticket to “Needs engineering sync” for engineers to estimate & implement instrumentation
[] @Engineers instrument according to deck
[] @analyst Create validation task after Beta release
#### Test Steps
Build: TestFlight 8.2.0 (latest).
1. Enable dev settings toggle "Send analytics to wmflabs".
2. Go to https://stream.wikimedia.beta.wmflabs.org/v2/ui/#/
Watch for events with Stream: "product_metrics.app_base", Instrument name: TBD