This task will track the racking, setup, and installation of the 18 new db hosts in codfw.
RAID: 10
RAID Stripe Size: 256kB
Rack proposal:
* 4 hosts on row A (different racks if possible)
* 5 hosts on row B (different racks if possible)
* 5 hosts on row C (different racks if possible)
* 4 hosts on row D (different racks if possible)
db2103: A3 ge-3/0/23
[] - receive in system on #procurement task T220431
[] - rack system with proposed racking plan (see above) & update netbox (include all system info plus location)
[] - bios/drac/serial setup/testing
[] - RAID10 stripsize 256kb
[] - mgmt dns entries added for both asset tag and hostname
[] - network port setup
** end on-site specific steps
[] - production dns entries
[] - operations/puppet update (install_server at minimum, other files if possible)
[] - OS installation (stretch) - update netbox status to staged
[] - puppet accept/initial run
[] - handoff for service implementation - service implementation team must change status from staged to active
db2104: A5 ge-5/0/14
[] - receive in system on #procurement task T220431
[] - rack system with proposed racking plan (see above) & update netbox (include all system info plus location)
[] - bios/drac/serial setup/testing
[] - RAID10 stripsize 256kb
[] - mgmt dns entries added for both asset tag and hostname
[] - network port setup
** end on-site specific steps
[] - production dns entries
[] - operations/puppet update (install_server at minimum, other files if possible)
[] - OS installation (stretch) - update netbox status to staged
[] - puppet accept/initial run
[] - handoff for service implementation - service implementation team must change status from staged to active
db2105:A6 ge-6/0/7
[] - receive in system on #procurement task T220431
[] - rack system with proposed racking plan (see above) & update netbox (include all system info plus location)
[] - bios/drac/serial setup/testing
[] - RAID10 stripsize 256kb
[] - mgmt dns entries added for both asset tag and hostname
[] - network port setup
** end on-site specific steps
[] - production dns entries
[] - operations/puppet update (install_server at minimum, other files if possible)
[] - OS installation (stretch) - update netbox status to staged
[] - puppet accept/initial run
[] - handoff for service implementation - service implementation team must change status from staged to active
db2106: A8 ge-8/0/3
[] - receive in system on #procurement task T220431
[] - rack system with proposed racking plan (see above) & update netbox (include all system info plus location)
[] - bios/drac/serial setup/testing
[] - RAID10 stripsize 256kb
[] - mgmt dns entries added for both asset tag and hostname
[] - network port setup
** end on-site specific steps
[] - production dns entries
[] - operations/puppet update (install_server at minimum, other files if possible)
[] - OS installation (stretch) - update netbox status to staged
[] - puppet accept/initial run
[] - handoff for service implementation - service implementation team must change status from staged to active
db2107:
[] - receive in system on #procurement task T220431
[] - rack system with proposed racking plan (see above) & update netbox (include all system info plus location)
[] - bios/drac/serial setup/testing
[] - RAID10 stripsize 256kb
[] - mgmt dns entries added for both asset tag and hostname
[] - network port setup
** end on-site specific steps
[] - production dns entries
[] - operations/puppet update (install_server at minimum, other files if possible)
[] - OS installation (stretch) - update netbox status to staged
[] - puppet accept/initial run
[] - handoff for service implementation - service implementation team must change status from staged to active
db2108:
[] - receive in system on #procurement task T220431
[] - rack system with proposed racking plan (see above) & update netbox (include all system info plus location)
[] - bios/drac/serial setup/testing
[] - RAID10 stripsize 256kb
[] - mgmt dns entries added for both asset tag and hostname
[] - network port setup
** end on-site specific steps
[] - production dns entries
[] - operations/puppet update (install_server at minimum, other files if possible)
[] - OS installation (stretch) - update netbox status to staged
[] - puppet accept/initial run
[] - handoff for service implementation - service implementation team must change status from staged to active
db2109:
[] - receive in system on #procurement task T220431
[] - rack system with proposed racking plan (see above) & update netbox (include all system info plus location)
[] - bios/drac/serial setup/testing
[] - RAID10 stripsize 256kb
[] - mgmt dns entries added for both asset tag and hostname
[] - network port setup
** end on-site specific steps
[] - production dns entries
[] - operations/puppet update (install_server at minimum, other files if possible)
[] - OS installation (stretch) - update netbox status to staged
[] - puppet accept/initial run
[] - handoff for service implementation - service implementation team must change status from staged to active
db2110:
[] - receive in system on #procurement task T220431
[] - rack system with proposed racking plan (see above) & update netbox (include all system info plus location)
[] - bios/drac/serial setup/testing
[] - RAID10 stripsize 256kb
[] - mgmt dns entries added for both asset tag and hostname
[] - network port setup
** end on-site specific steps
[] - production dns entries
[] - operations/puppet update (install_server at minimum, other files if possible)
[] - OS installation (stretch) - update netbox status to staged
[] - puppet accept/initial run
[] - handoff for service implementation - service implementation team must change status from staged to active
db2111:
[] - receive in system on #procurement task T220431
[] - rack system with proposed racking plan (see above) & update netbox (include all system info plus location)
[] - bios/drac/serial setup/testing
[] - RAID10 stripsize 256kb
[] - mgmt dns entries added for both asset tag and hostname
[] - network port setup
** end on-site specific steps
[] - production dns entries
[] - operations/puppet update (install_server at minimum, other files if possible)
[] - OS installation (stretch) - update netbox status to staged
[] - puppet accept/initial run
[] - handoff for service implementation - service implementation team must change status from staged to active
db2112:
[] - receive in system on #procurement task T220431
[] - rack system with proposed racking plan (see above) & update netbox (include all system info plus location)
[] - bios/drac/serial setup/testing
[] - RAID10 stripsize 256kb
[] - mgmt dns entries added for both asset tag and hostname
[] - network port setup
** end on-site specific steps
[] - production dns entries
[] - operations/puppet update (install_server at minimum, other files if possible)
[] - OS installation (stretch) - update netbox status to staged
[] - puppet accept/initial run
[] - handoff for service implementation - service implementation team must change status from staged to active
db2113:
[] - receive in system on #procurement task T220431
[] - rack system with proposed racking plan (see above) & update netbox (include all system info plus location)
[] - bios/drac/serial setup/testing
[] - RAID10 stripsize 256kb
[] - mgmt dns entries added for both asset tag and hostname
[] - network port setup
** end on-site specific steps
[] - production dns entries
[] - operations/puppet update (install_server at minimum, other files if possible)
[] - OS installation (stretch) - update netbox status to staged
[] - puppet accept/initial run
[] - handoff for service implementation - service implementation team must change status from staged to active
db2114:
[] - receive in system on #procurement task T220431
[] - rack system with proposed racking plan (see above) & update netbox (include all system info plus location)
[] - bios/drac/serial setup/testing
[] - RAID10 stripsize 256kb
[] - mgmt dns entries added for both asset tag and hostname
[] - network port setup
** end on-site specific steps
[] - production dns entries
[] - operations/puppet update (install_server at minimum, other files if possible)
[] - OS installation (stretch) - update netbox status to staged
[] - puppet accept/initial run
[] - handoff for service implementation - service implementation team must change status from staged to active
db2115:
[] - receive in system on #procurement task T220431
[] - rack system with proposed racking plan (see above) & update netbox (include all system info plus location)
[] - bios/drac/serial setup/testing
[] - RAID10 stripsize 256kb
[] - mgmt dns entries added for both asset tag and hostname
[] - network port setup
** end on-site specific steps
[] - production dns entries
[] - operations/puppet update (install_server at minimum, other files if possible)
[] - OS installation (stretch) - update netbox status to staged
[] - puppet accept/initial run
[] - handoff for service implementation - service implementation team must change status from staged to active
db2116:
[] - receive in system on #procurement task T220431
[] - rack system with proposed racking plan (see above) & update netbox (include all system info plus location)
[] - bios/drac/serial setup/testing
[] - RAID10 stripsize 256kb
[] - mgmt dns entries added for both asset tag and hostname
[] - network port setup
** end on-site specific steps
[] - production dns entries
[] - operations/puppet update (install_server at minimum, other files if possible)
[] - OS installation (stretch) - update netbox status to staged
[] - puppet accept/initial run
[] - handoff for service implementation - service implementation team must change status from staged to active
db2117:
[] - receive in system on #procurement task T220431
[] - rack system with proposed racking plan (see above) & update netbox (include all system info plus location)
[] - bios/drac/serial setup/testing
[] - RAID10 stripsize 256kb
[] - mgmt dns entries added for both asset tag and hostname
[] - network port setup
** end on-site specific steps
[] - production dns entries
[] - operations/puppet update (install_server at minimum, other files if possible)
[] - OS installation (stretch) - update netbox status to staged
[] - puppet accept/initial run
[] - handoff for service implementation - service implementation team must change status from staged to active
db2118:
[] - receive in system on #procurement task T220431
[] - rack system with proposed racking plan (see above) & update netbox (include all system info plus location)
[] - bios/drac/serial setup/testing
[] - RAID10 stripsize 256kb
[] - mgmt dns entries added for both asset tag and hostname
[] - network port setup
** end on-site specific steps
[] - production dns entries
[] - operations/puppet update (install_server at minimum, other files if possible)
[] - OS installation (stretch) - update netbox status to staged
[] - puppet accept/initial run
[] - handoff for service implementation - service implementation team must change status from staged to active
db2119:
[] - receive in system on #procurement task T220431
[] - rack system with proposed racking plan (see above) & update netbox (include all system info plus location)
[] - bios/drac/serial setup/testing
[] - RAID10 stripsize 256kb
[] - mgmt dns entries added for both asset tag and hostname
[] - network port setup
** end on-site specific steps
[] - production dns entries
[] - operations/puppet update (install_server at minimum, other files if possible)
[] - OS installation (stretch) - update netbox status to staged
[] - puppet accept/initial run
[] - handoff for service implementation - service implementation team must change status from staged to active
db2120:
[] - receive in system on #procurement task T220431
[] - rack system with proposed racking plan (see above) & update netbox (include all system info plus location)
[] - bios/drac/serial setup/testing
[] - RAID10 stripsize 256kb
[] - mgmt dns entries added for both asset tag and hostname
[] - network port setup
** end on-site specific steps
[] - production dns entries
[] - operations/puppet update (install_server at minimum, other files if possible)
[] - OS installation (stretch) - update netbox status to staged
[] - puppet accept/initial run
[] - handoff for service implementation - service implementation team must change status from staged to active