This task will track the racking, setup, and OS installation of E8/F8 new leaf switches ordered via T380017
== Hostname / Racking / Installation Details ==
#netops will need to detail how to cable these into the spine/leaf configuration.
== Per host setup checklist ==
Each host should have its own setup checklist copied and pasted into the list below.
==== switch1
[x] Receive in system on #procurement task T380017 & in Coupa
[] Rack system with proposed racking plan (see above) & update Netbox (include all system info plus location, state of planned)
[x] Configure switch with Homer and add to monitoring
==== switch2
[x] Receive in system on #procurement task T380017 & in Coupa
[] Rack system with proposed racking plan (see above) & update Netbox (include all system info plus location, state of planned)
[x] Configure switch with Homer and add to monitoring