This task will track the migration of the ps1 and ps2 to be replaced with new PDUs in rack [[ https://netbox.wikimedia.org/dcim/racks/7/ | A7-eqiad ]].
Each server & switch will need to have potential downtime scheduled, since this will be a live power change of the PDU towers.
These racks have a single tower for the old PDU (with and A and B side), with the new PDUs having independent A and B towers.
[] - schedule downtime for the entire list of switches and servers.
[] - Wire up one of the two towers, energize, and relocate power to it from existing/old pdu tower (now de-energized).
[] - confirm entire list of switches, routers, and servers have had their power restored from the new pdu tower
[] - Once new PDU tower is confirmed online, move on to next steps.
[] - Wire up remaining tower, energize, and relocate power to it from existing/old pdu tower (now de-energized).
[] - confirm entire list of switches, routers, and servers have had their power restored from the new pdu tower
== List of routers, switches, and servers ==
| device | role | SRE team coordination
| asw2-a7-eqiad | asw | @ayounsi
| sodium
| ms-fe1005 | ms-fe | @fgiunchedi
| an-worker1082 | #analytics
| an-worker1081| #analytics
| cp1077 | cp | #traffic
| cp1078 | cp | #traffic
| ms-be1040 | ms-be | @fgiunchedi
| kafka-main1001 || @herron
| dbprov1001 | db provisioning | #dba
| lvs1013 | lvs | #traffic
| mw1283
| mw1282
| mw1281
| mw1280
| mw1279
| mw1278
| mw1277
| mw1276
| mw1275
| mw1274
| mw1273
| mw1272
| mw1271
| mw1270
| mw1269
| mw1268
| mw1267
| ms-be1030 | ms-be | @fgiunchedi
| ms-be1029 | ms-be | @fgiunchedi
| ms-be1028 | ms-be | @fgiunchedi