Page MenuHomePhabricator

setup the 2 new esams ms-be systems
Closed, DeclinedPublic

Description

The two systems purchased on procurement RT 7337 have been delivered to ESAMS. As such, I've created this phab task for their setup (and potential racking). (Since the order ticket is sitting open for system deployment, not a typical use of the procurement ticket.)

If they have been racked and are accessible, then the assignment should change from Mark to Filippo, but I am not sure if that is the case.

Event Timeline

RobH assigned this task to mark.
RobH raised the priority of this task from to Needs Triage.
RobH updated the task description. (Show Details)
RobH added a project: ops-core.
RobH added subscribers: RobH, fgiunchedi.
faidon added a project: ops-esams.
faidon set Security to None.
faidon subscribed.

No, they're not racked yet.

is this ms-be3006 / ms-be3007 ? looks liek a duplicate of T91637