This task will track the racking, setup, and OS installation of new spine/leaf switches for codfw ordered via T348062
#netops will need to provide a detailed cabling assignment/layout for the purchase of cables via T360671, that same cable diagram can be used here.
== Hostname / Racking / Installation Details ==
This section will need to be filled out by #ops-codfw detailing the process and checklist for the upgrade of rows C and D.
|Switch|racked|power|mgmt|ZTP|console|ssw1-d1-leaf link|ssw1-d8-leaf link|cr-spine link|ssw1-a1-link|ssw1-a8-link|
|ssw1-d1|{icon check color=green}|{icon check color=green}|{icon check color=green}|{icon check color=green}
|ssw1-d8|{icon check color=green}|{icon check color=green}|{icon check color=green}|{icon check color=green}
|lsw1-c1|{icon check color=green}|{icon check color=green}|{icon check color=green}|{icon check color=green}
|lsw1-c2|{icon check color=green}|{icon check color=green}|{icon check color=green}|
|lsw1-c3|{icon check color=green}|{icon check color=green}|{icon check color=green}|{icon check color=green}
|lsw1-c4|{icon check color=green}|{icon check color=green}|{icon check color=green}|{icon check color=green}
|lsw1-c5|{icon check color=green}|{icon check color=green}|{icon check color=green}|{icon check color=green}
|lsw1-c6|{icon check color=green}|{icon check color=green}|{icon check color=green}|{icon check color=green}
|lsw1-c7|{icon check color=green}|{icon check color=green}|{icon check color=green}|{icon check color=green}
|lsw1-d1|{icon check color=green}|{icon check color=green}|{icon check color=green}|{icon check color=green}
|lsw1-d2|{icon check color=green}|{icon check color=green}|{icon check color=green}|{icon check color=green}
|lsw1-d3|{icon check color=green}|{icon check color=green}|{icon check color=green}|{icon check color=green}
|lsw1-d4|{icon check color=green}|{icon check color=green}|{icon check color=green}|{icon check color=green}
|lsw1-d5|{icon check color=green}|{icon check color=green}|{icon check color=green}|{icon check color=green}
|lsw1-d6|{icon check color=green}|{icon check color=green}|{icon check color=green}|{icon check color=green}
|lsw1-d7|{icon check color=green}|{icon check color=green}|{icon check color=green}|{icon check color=green}
|lsw1-d8|{icon check color=green}|{icon check color=green}|{icon check color=green}|{icon check color=green}
The cabling will be the same as row A and B. We will be using port 55 on each leaf switch to connect to ssw1-d1 and port 54 to connect to ssw1-d8; et-0/0/31 on each spine will be connected to cr*(1/2)
@ayounsi @cmooney please provide the interfaces to use on cr* for the uplink from ssw1-d1 to cr1 and ssw1-d8 to cr2
et-0/0/30 on each spine will be use to connect spines in row D and C to spines in row A and B
please