Prepare study outline with SU before March.
- Define scope
- Survey tool (Qualtrics) and propose questions.
- Coordinate with the teachers so that survey is distributed on 13 March.
Prepare study outline with SU before March.
The survey was distributed on March 13.
See T191381: Match lists of respondents in Pilot study