What
Implement a PIRS entry point so that a PIRS report can be initiated at the user talk page level.
Background
TST needs to implement various entry points to the PIRS system one of which is user talk pages.
Acceptance criteria
- A PIRS report can be initiated from a user talk page as shown in the attached design spec.
Additional REF - T322853