As WME engineer I want to take the lastest of Structured Endpoint changes to production.
Acceptance Criteria
- Execute Production release
- Deploy service
- QA service after deploy to be sure all is working
As WME engineer I want to take the lastest of Structured Endpoint changes to production.
Acceptance Criteria
Status | Subtype | Assigned | Task | ||
---|---|---|---|---|---|
Resolved | None | T350103 OKR 4.4 | |||
Resolved | None | T344911 {Machine Readability} Add short description | |||
Resolved | ROdonnell-WMF | T344903 Add Short description | |||
Resolved | REsquito-WMF | T345840 Deploy Short Description in Structured Contents in production |