Q4 2016-2017 goal for Technical Operations has as key results:
- Eliminate SPOFs in the existing eqiad infrastructure
- Expand the infrastructure to codfw
- Prepare and maintain base container images
- Define a process to keep images up-to-date on similar standards as the rest of production
- Design and implement a Kubernetes-based staging environment. (stretch)