Decommisson and store old row D network gear.
Open, LowPublic

Description

The old network gear in row D can be removed according to @ayounsi. Each of the network switches need to be restored to factory defaults prior to removing from the racks.

Event Timeline

Cmjohnson moved this task from Backlog to Not urgent on the ops-eqiad board.Jul 12 2017, 8:15 PM
Cmjohnson moved this task from Not urgent to Decommission on the ops-eqiad board.Jul 20 2017, 3:24 PM

@ayounsi Removed all the old network gear from row D. The ex4200's are going to be decommissioned. Do we want to hold on to the 43 EX4550's?

ayounsi added a comment.EditedAug 28 2018, 4:43 PM

Some ex4200 need to be kept to replace the OOB (mgmt) switches (as many as we have OOB switches (+ a couple spares).
The EX4550's are not needed.
Is 43 a typo? that sounds like a lot.
EDIT: from IRC, it's 3,

As long as we have EX4550 in production, we should keep at least 1 spare, the others are not needed.