Decommisson and store old row D network gear.
Closed, ResolvedPublic

Description

The old network gear in row D can be removed according to @ayounsi. Each of the network switches need to be restored to factory defaults prior to removing from the racks.

Event Timeline

@ayounsi Removed all the old network gear from row D. The ex4200's are going to be decommissioned. Do we want to hold on to the 43 EX4550's?

Some ex4200 need to be kept to replace the OOB (mgmt) switches (as many as we have OOB switches (+ a couple spares).
The EX4550's are not needed.
Is 43 a typo? that sounds like a lot.
EDIT: from IRC, it's 3,

As long as we have EX4550 in production, we should keep at least 1 spare, the others are not needed.

This task has been assigned to the same task owner for more than two years. Resetting task assignee due to inactivity, to decrease task cookie-licking and to get a slightly more realistic overview of plans. Please feel free to assign this task to yourself again if you still realistically work or plan to work on this task - it would be welcome!

For tips how to manage individual work in Phabricator (noisy notifications, lists of task, etc.), see https://phabricator.wikimedia.org/T228575#6237124 for available options.
(For the records, two emails were sent to assignee addresses before resetting assignees. See T228575 for more info and for potential feedback. Thanks!)

all of old row D's old network was removed awhile ago. resolving this task