upgrade all codfw switch stacks to include additional 10G switch per row
Closed, ResolvedPublic

Description

This task will track the overall upgrade of an additional 10G QFX5100 into each of the rows. This will be the overall tracking task, each rack will need a sub-task setup to coordinate the downtime for the systems in the 4th rack for each row:

Currently, each row has only 2 10G racks, Rack 2 and 7. When this is done, racks 2, 4, and 7 will be 10G. This will set codfw to mirror the 1G/10G layout in eqiad.

Hostname Note: Name each of the new QFX5100 switches as asw2-a4-codfw, asw2-b4-codfw, asw2-c4-codfw, asw2-d4-codfw. Add then into racktables with asset tags, even though we won't rack them quite yet (since they'll end up going where the EX4300 is in each of those racks.)

Event Timeline

RobH renamed this task from upgrade all codfw switch stacks to include additional 10G to upgrade all codfw switch stacks to include additional 10G switch per row.Jun 5 2018, 5:46 PM
RobH triaged this task as Medium priority.
RobH created this task.
Vvjjkkii renamed this task from upgrade all codfw switch stacks to include additional 10G switch per row to albaaaaaaa.Jul 1 2018, 1:05 AM
Vvjjkkii removed ayounsi as the assignee of this task.
Vvjjkkii raised the priority of this task from Medium to High.
Vvjjkkii updated the task description. (Show Details)
Vvjjkkii removed a subscriber: Aklapper.
CommunityTechBot renamed this task from albaaaaaaa to upgrade all codfw switch stacks to include additional 10G switch per row.Jul 2 2018, 6:52 AM
CommunityTechBot assigned this task to ayounsi.
CommunityTechBot lowered the priority of this task from High to Medium.
CommunityTechBot updated the task description. (Show Details)
CommunityTechBot added a subscriber: Aklapper.
ayounsi updated the task description. (Show Details)

All child tasks done.