Page MenuHomePhabricator

Edit cards: instrument existing "adding/modifying links" flow
Closed, DuplicatePublic

Description

Task overview

This task represents the work involved with instrumenting the existing adding/modifying links workflow in mobile VE.

Dependencies

In order for work to begin on this task, the following needs to be true:

  • We have defined the actions/events we need to instrument. This list, when completed, can be found within the "Existing adding/modifying links flow: actions/events needing instrumentation" section of T222367's task description

Definition of done

  • Existing adding and modifying links edit flow instrumentation is live at least 2 weeks before T221314

Event Timeline

In order to ensure we have "enough data" [1] to compare the revised "structured" edit workflow to the existing edit workflow, instrumentation of the existing needs to be live and gathering data for at least two weeks before the "structured" flow is released.

This two week timeframe could change depending on the wikis we move forward with. See T221816

The above is a result of @Neil_P._Quinn_WMF's and my conversation on 23-April.


  1. Enough data: it is not likely 2 weeks worth of data will be produce a large enough sample size to reach statistically significant results. We are accepting this tradeoff.