After T135327: Decide Phabricator improvements to be funded by WMF Technical Collaboration, now it is time to complete the work:
- Sign contract with Phacility Inc
- T165: Provide a way to upload a file in Phabricator if drag'n'drop is not available or not wanted
- T136071: Get Phabricator i18n ready for translatewiki.net
- T76732: Exact matches should always win when suggesting/auto-completing
- T33: Phabricator should let you add dependencies both ways (depending and blocking)
- T75851: Email notification for "edited the task description" does not contain the actual content changes (diff) nor a link
- T234: Projects dropdown should offer project descriptions
- T96464: Upon edit, a task description which mentions a Phab user (re)adds that Phab user to CC/Subscribers field
T1035: Consolidate the many tech events calendars in Phabricator's calendar(though still open, no really clear technical scope provided, hence not considered a hard blocker)- T634: pholio/new/ requires drag and drop
- T78824: Phabricator task description diffs inaccurate due to 80-character line wrapping
- T78078: Videos cannot be viewed without downloading